Panther® Plus

    Increased capacity, walkaway time and throughput in 24 hours.

    Add on capacity with the MTU expansion module and gain the ability to plumb liquid waste and continuously dispose of fluids/wastes.

      • Increase capacity up to 120 MTUs (600 tests) providing 13.5 hours of walkaway time before additional loading is required.
      • Plumb liquid waste directly into laboratory drain or sink, eliminating manual disposal.
      • Access and change universal fluids during assay processing, avoiding disruptions at beginning or end of shift.
      • Dispose solid waste on demand for uninterrupted processing, increasing throughput by an additional 210 tests in 24 hours.
      • Change fluids and waste during processing to minimize start-up activities, allowing runs to begin earlier and results to release sooner.
      • Optimize universal fluids and waste bag usage by changing less often, reducing the volume and associated expense of disposables.
      • In-lab upgrade adds further capacity, walkaway time and throughput without replacing equipment or infrastructure.

      Options

      Option 2

      Continuous fluids/waste + plumbed liquid waste

      Option 3

      Continuous fluids/waste + MTU expansion

      Option 4

      Continuous fluids/waste + plumbed liquid waste + MTU expansion

      Find Support

      All Other Requests

      Panther® Plus

      Increased capacity, walkaway time and throughput in 24 hours

      Add on capacity with the MTU expansion module and gain the ability to plumb liquid waste and continuously dispose of fluids/wastes.

        • Increase capacity up to 120 MTUs (600 tests) providing 13.5 hours of walkaway time before additional loading is required
        • Plumb liquid waste directly into laboratory drain or sink, eliminating manual disposal
        • Access and change universal fluids during assay processing, avoiding disruptions at beginning or end of shift
        • Dispose solid waste on demand for uninterrupted processing, increasing throughput by an additional 210 tests in 24 hours
        • Change fluids and waste during processing to minimize start-up activities, allowing runs to begin earlier and results to release sooner
        • Optimize universal fluids and waste bag usage by changing less often, reducing the volume and associated expense of disposables
        • In-lab upgrade adds further capacity, walkaway time and throughput without replacing equipment or infrastructure

        Options

        Option 2

        Continuous fluids/waste + plumbed liquid waste

        Option 3

        Continuous fluids/waste + MTU expansion

        Option 4

        Continuous fluids/waste + plumbed liquid waste + MTU expansion

        Find Support

        All Other Requests